青島海洋科學與技術(shù)國家實驗室主要依托于:中國海洋大學、國家海洋局一海洋研究所、中國科學院海洋研究所、農(nóng)業(yè)部水科院黃海水產(chǎn)研究所、國土資源部青島海洋地質(zhì)研究所等五家單位共建。該地源熱泵中央空調(diào)系統(tǒng)項目位于山東省即墨市鰲山衛(wèi),總建筑面積約為14000平米,其中空調(diào)面積總共9700平方米,占總面積的70%。
Qingdao Ocean Science and Technology National Laboratory mainly relies on: Ocean University of China, the State Oceanic Administration First Ocean Research Institute, Institute of Oceanology, Chinese Academy of Sciences, Ministry of Agriculture, Chinese Academy of Water Resources, Institute of Marine Geology, Ministry of Land and Resources, etc. Five units to build. The ground source heat pump central air conditioning system project is located in Shandong Province Jimo City Aoshan Wei, a total construction area of about 14,000 square meters, of which a total area of 9700 square meters of air-conditioned, accounting for 70% of the total area.
該項目采用的地埋管形式的地源熱泵中央空調(diào)系統(tǒng),工程計算冷負荷為880kw,熱負荷總計為700kw。冷負荷的定義是維持室內(nèi)空氣熱濕參數(shù)在一定要求范圍內(nèi)時,在時間單位內(nèi)需要從室內(nèi)出去的熱量,包括顯熱量和潛熱量兩部分。熱負荷的定義為在冬季某一室外溫度下,為達到要求的室內(nèi)溫度,供熱系統(tǒng)在單位時間內(nèi)向建筑物供給的熱量。該實驗室綜合樓項目總計選取了兩臺機組為整個項目供暖制冷。該項目為交鑰匙工程,在項目建造施工完成后,經(jīng)沃富新能源公司調(diào)試試運行后,順利交付甲方。該項目總計地埋空數(shù)量為110孔,采用PE地源熱泵管材雙U行布置,有效孔深為100M。
The project used in the form of ground-based ground source heat pump central air conditioning system, the project calculated cooling load of 880kw, heat load total of 700kw. Cold load is defined as the maintenance of indoor air heat and humidity parameters within a certain range, the time unit needs to go out from the indoor heat, including heat and latent heat in two parts. The heat load is defined as the amount of heat that the heating system supplies to the building in a unit time to meet the required indoor temperature at an outdoor temperature in the winter. The laboratory complex building project selected a total of two units for the entire project heating and cooling. The project for the turnkey project, after the completion of the construction of the project, the new operation by the Wo Fu new energy commissioning test, the smooth delivery of Party A. The total amount of the project is 110 holes, the use of PE source heat pump tubing dual U row layout, the effective hole depth of 100M.
該項目交付以來,地源熱泵機組運行狀態(tài)良好,制冷制熱效率完全達到預期設計要求。是沃富新能源在地源熱泵領域又一次強有力的實力見證。沃富新能源本著高標高要求的運營理念,本著施工質(zhì)量為核心,以完備的運營施工體系,為每一個客戶定制解決冷暖系統(tǒng)。
Since the delivery of the project, the unit running in good condition, refrigeration and heating efficiency fully meet the expected design requirements. Wo Fu new energy in the field of ground source heat pump once again a strong strength to witness. Wo Fu new energy in the high standard requirements of the operating philosophy, in the construction quality as the core, with a complete operating system for each customer customization to solve the cold and warm system.